Chevron Australia
2011
Plant location
Plant location
Customers
GE Oil & Gas
Nr. cabs
5 CC / 5 BR / 5 ATR
Dimensions (L x W x H)
17 x 3,5x 3,8 m
12 x 2,6 x 2,7 m
6,2 x 3,5 x 3,8 m
12 x 2,6 x 2,7 m
6,2 x 3,5 x 3,8 m
Specifications
- Control Room and Battery Room to be positioned on Baker Hughes Module
- Buildings realized with special material resilient to -30° ( including insulation)
- Special welinding process and certification required according canadian CWB 47.1
- 2x100 % split HVAC including Pressurization system entirely supplied in Canada
- Fire & Gas detection system cUL certified
- Buildings certified according CSA standard from Intertek
Other projects