Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
SUD ELETTRA
| Nigeria Agip Oil Company (NAOC)
| 18000X3500X3600
| 1 | Nigeria – Tebidaba Flowstation revamping
| 2002 |
SUD ELETTRA
| Nigeria Agip Oil Company (NAOC) | 18000X3500X3600
| 1 | Nigeria – Oshie Flowstation revamping
| 2002 |
ABB LUMMUS
| SONATRACH | 9940X3015X3520
| 1 | Algeria- Oleoduc Heh Skikda
| 2003 |
SUD ELETTRA
| Nigeria Agip Oil Company (NAOC)
| 18000X3500X3600 | 1 | Nigeria – Obama Flowstation revamping
| 2003 |
GE Oil & Gas | REPUBLIE OF IRAQ MINISTERY OF ELECTRICITY
| 16700x 3848x 3500
| 8 | PSO-IRAQ CRUDE PROJECT
| 2004-2005
|
GE Oil & Gas
| SAUDI ARAMCO
| 9000x3500x3600
| 1 | Haradah Saudi Arabia GOSP 3
| 2005 |
GE Oil & Gas
| ABU DHABI GAS LIQUEFACTION COMPANY – ADGAS
| Control Room:14000x3500x3600mm; Battery Room & Transformer Room: 6000x3500x3600mm
| 1 | DAS ISLAND ABU DHABI
| 2005 |
GE Oil & Gas
| SAUDI ARAMCO
| Control Room: 18000x3500x3600 Battery Room: 5660x2990x3600
| 4 | HAWIYAH NGL RECOVERY
| 2006 |
2
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| CTCI Taiwan x PTTUT Thailand
| 13000x3500x3600
| 1 | Thailand | 2006-2007
|
GE Oil & Gas | GE Oil & Gas for PTTUT Thailand
| 13000x3500x3600 | 1 | Thailand | 2006-2007 |
GE Oil & Gas
| CTCI Taiwan x PTTUT Thailand
| 13000x3500x3600 | 1 | Thailand | 2006-2007 |
GE Oil & Gas
| SNC LAVALIN FOR SAUDI ARAMCO
| 10000x3500x3600
| 7 | SOUTHERN AREA SEAWATER CAPACITY EXPANSION – AINDAR, HARADH, HAWIYAH, UTHMANIYA – SAUDI ARABIA
| 2006-2007 |
GE Oil & Gas | SNAMPROGETTI FOR SAUDI ARAMCO
| 10000x3500x3600
| 5 | WATER INJECTION FACILITIES & UTILITIES ( KUC ) PROJECT – KHURAIS – SAUDI ARABIA
| 2007 |
GE Oil & Gas
| IRPC PUBLIC COMPANY LIMITED
| 13000x3500x3600
| 6 | Thailand | 2008 |
GE Oil & Gas
| IRPC PUBLIC COMPANY LIMITED
| 13000x3500x3600 | 6 | Thailand | 2008 |
GE Oil & Gas
| PTT CHEMICAL PUBLIC COMPANY LIMITED
| 13000x3500x3600 | 2 | Thailand | 2008 |
3
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| MOTIVA ENTERPRISES | 18000x3500x3600
| 4 | Texas – USA
| 2008 |
GE Oil & Gas
| PDVSA PETROCEDEÑO
| 21000x3500x3600
| 1 | Venezuela | 2008 |
GE Oil & Gas
| NAOC/AGIP | 13000x10500x3600 | 1 | EBOCHA – Nigeria
| 2008 |
GE Oil & Gas
| ENI Congo
| 8200x2500x3100 | 1 | M’BOUNDI – Congo
| 2009 |
GE Oil & Gas | BAGHDAD COMPANY LTD
| 18000x3600x3600
| 2 | IRAQ | 2009 |
GE Oil & Gas
| PTT CHEMICAL PUBLIC COMPANY LIMITED
| 13000x3500x3600
| 1 | Thailand | 2009 |
GE Oil & Gas
| SAIPEM/SONATRACH
| 23000x3500x3600 | 4 | ARZEW/ALGERIA
| 2009 |
GE Oil & Gas
| DANSKE SHELL
| 8000x4500x3300
| 2 | FREDERICIA REFINERY – DENMARK
| 2009 |
GE Oil & Gas
| FEDERAL MINISTRY OF ENERGY
| 18000x3600x3800
| 8 | NORTH WEST NIGERIA
| 2010 |
SAIPEM KAZAKHSTAN BRANCH
| SAIPEM KAZAKHSTAN BRANCH
| 12000x3000x3500 | 1 | KAZAKHSTAN | 2010 |
4
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| REPHOLDING (St.
Petersburg | 20000x4000x3500 | 1 | Uvinskaya (Vavogskaya) –
Gryazovets (RUSSIA)
| 2010 |
GE Oil & Gas for ABB LUMMUS GLOBAL Inc. | EXXON
NEFTEGAS
| 22000x5000x4500 | 1 | Sakhalin 1 – Phase 1
Sakhalin Island (Russia | 2011 |
PETROFAC | SHELL IRAQ PETROLEUM DEVOLEPMENT B.V
| 14000x5000x3800
| 1 | MAJNOON, SOTHERN IRAQ
| 20082011 |
GE Oil & Gas
| CHEVRON AUSTRALIA PTY LTD
| 17000x3500x3800 Control Room 6200x4100x3800 Transf. Room 12000x2600x2745 Battery Room
| 5 | BARROW ISLAND / AUSTRALIA
| 2011 |
GE Oil & Gas | EXXON MOBIL
| 21000x4100x3800
| 10 | PAPUA NEW GUINEA
| 2011-2012
|
GE Oil & Gas
| EXXON MOBIL
| 4500x2400x3000
| 2 | PAPUA NEW GUINEA
| 2011-2012
|
GE Oil & Gas
| BECHTEL FOR QGC
(A BG GROUP BUSINESS)
| 11000x6300x3800
| 3 | CURTIS ISLAND, QUEENSLAND (AUSTRALIA)
| 2011-2012
|
GE Oil & Gas
| TOTAL E&P UK
| 14000x4000x3800
| 3 | SHETLAND GAS PLANT / LAGGAN – TORMORE PROJECT
| 2011-2012
|
ABB | SHELL GAS IRAQ BV
| 40000x18000x4450
| 1 | KHOR AL ZUBAIR / IRAQ
| 2012 |
ABB | SHELL GAS IRAQ BV
| 17000x4300x4020
| 2 | KHOR AL ZUBAIR / IRAQ
| 2012 |
5
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| ENERGOCASCADE | 21000x4500x4200
| 1 | VANKORNEFT GT COMPRESSOR STATION
| 2012 |
GE Oil & Gas for ABB LUMMUS GLOBAL Inc. | TENGIZCHEVROIL (TCO)
| 23000x4850x4500 | 1 | TENGIZ FIELD – KAZAKHSTAN
| 2012 |
GE Oil & Gas
| EFACEC | 8200x2500x3100 | 2 | REFINERY OF LUANDA – ANGOLA
| 2012 |
GE Oil & Gas
| GE Energy
| 2991x2438x2591 | 1 | TURKEY | 2012 |
GE Oil & Gas | MELLITAH GAS B.W
| 19000x3900x3800 | 4 | WAFA DESERT PLANT – LYBIA
| 2011-2013
|
GE Oil & Gas
| BRUNEI LNG SDN BHD
| 23000x4000x3800
| 2 | LUMUT, BRUNEI DARUSSALAM
| 2013-2014
|
GE Oil & Gas
| SNAM RETE GAS
| 10100x4000x3300
| 2 | MESSINA – ITALY
| 2013-2014
|
FAAM | ABB/ENEL
| 12195x2438x2996 | 2 | ACATE (ME) – ITALY
| 2013 |
SSE | LEIGHTON FOR SOC
| 7000x6780x6665 | 1 | ABOT – IRAQ OFFSHORE
| 2013 |
SSE | LEIGHTON FOR SOC
| 11500x4000x6868
| 1 | KAAOT – IRAQ OFFSHORE
| 2013 |
6
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
ABB | SAIPEM/TOTAL E&P
| 18000x4000x3760
| 1 | NORTHERN OPTIONAL GAS PIPELINE PROJECT – RUMUJI NODE – NIGERIA
| 2013-2014
|
GE Oil & Gas for ABB LUMMUS GLOBAL Inc. | GE Energy
| 2991x2438x2591
| 1 | TURKEY | 2014 |
GE Oil & Gas
| IHI | 22500x6300x3800
| 2 | DOMINION LNG – USA
| 2014-2015
|
GE Oil & Gas
| IHI | 22500x6300x3800
| 1 | DOMINION LGB – USA
| 2014-2015 |
GE Oil & Gas | ZAKUM DEVELOPMENT COMPANY / PETROFAC
| 13400x7000x4000 Control Room 6200x4200x4000 Transf. Room 10500x3500x3200 Battery Room
| 18 | ZADCO PROJECT – UAE
| 2014-2015
|
GE Oil & Gas
| CAMERON LNG
| 28000x4000x3900
RIE 8000x4000x3900 Batterry Room
| 6 | CAMERON LNG – USA
| 2015-2016
|
GE Power Conversion
| GE Oil & GAS – CCJV – Cameron LNG
| 26200x9100x4240
| 3 | CAMERON LNG – USA
| 2015-2016 |
GE Power Conversion
| GE Oil & GAS – CCJV – Cameron Residue
| 25300x5100x4000
| 3 | CAMERON LNG – USA
| 2015-2016
|
GE Oil & Gas
| BP AND CHINA PETROLEUM ENGINEERING AND CONSTRUCTION
| 21500x3800x3800 Control Room 9500x3600x3800 Battery Room
| 15 | IRAQ | 2015-2016
2015-2016
|
GE Oil & Gas
| STATOIL JOHAN SVERDRUP PLATFORM (OFFSHORE)
| 6250x3600x3500
| 1 | Norway | 2015-2016
|
7
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| SAUDI ARAMCO
| 11000x3700x3600
| 3 | KHURAIS, AINDAR – SAUDI ARABIA
| 2016 |
GE Oil & Gas for ABB LUMMUS GLOBAL Inc. | ENGINEERS INDIA LIMITED x DANGOTE OIL REFINERY COMPANY
| 15000x5000x4200
| 8 | LEKKI FREE TRADE ZONE – NIGERIA
| 2016 in progress
|
GE Oil & Gas
| PGS
IRAQ Power Generation Plant
MOE Project
| 19000x4000x3900
| 8 | South Baghdad – IRAQ
Hilla – IRAQ
| 2017 |
PIETRO FIORENTINI ENNPI
| ENI-PETROBEL
| 7000x2000x2800 (n°2) 14500x3000x3500
| 3 | ZHOR – EGYPT
| 2017 |
TMEIC EUROPE FORMAL | MDT/BASF
| 14500x3500x4200 | 1 | SPAIN | 2017 |
GE Grid Solution
| ENGIE 2MW DROGENBOS | 13500x3000x3600
| 1 | BELGIUM | 2017 |
GE Oil & Gas
| PETRONAS GAS BERHAD (PGB)
| 23500x3800x3800
| 1 | MALAYSIA – Utilities Gebeng
| 2017 |
Honeywell | AXION ENERGY
| 15200x7300x4210 | 2 | ARGENTINE | 2017 |
GE Oil & Gas
| HERA | 4500x3500x3500 | 1 | ITALY | 2018 |
GE Oil & Gas
| BP | 4900x4100x3700
| 3 | TRINIDAD & TOBAGO
| 2018 |
8
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
GE Oil & Gas
| YINSON | 6000x3300x3900 | 2 | FPSO MALAYSIA
| 2018 |
PIETRO FIORENTINI ENNPI
| ENI-PETROBEL
| 12500x3200x3700
| 1 | ZOHR – EGYPT
| 2018 |
GE Oil & Gas
| OLTIN YO’L GTL
| 17000x3900x3900 | 2 | UZBEKISTAN | 2018 |
SCHNEIDER for SAIPEM | Nigeria Agip Oil Company (NAOC)
| 12000x5000x3700 | 3 | OKPAI NIGERIA
| 2018 |
TOZZI for SAIPEM
| Nigeria Agip Oil Company (NAOC)
| 12000x6000x3700 | 8 | OKPAI NIGERIA
| 2018 |
GE Oil & Gas
| LG CHEM
| 20000x3900x3900
| 1 | KOREA | 2019 |
GE Oil & Gas
| HYUNDAI | 6000x3200x3900
| 1 | MELAKA
MALAYSIA
| 2019 |
GE Oil & Gas
| JOHAN CASTBERG STATOIL
| 9700x3400x3500 | 2 | NORWAY | 2019 |
Danieli | LONDON | 13.000 x 4.600 x
(H) 3.950 mm
| 1 | UK | 2020 |
Danieli | ILLINOIS | 12.200 x 4.900 x
(H) 2.900 mm
| 2 + 2
| USA | 2020 |
9
Customers | End user | External dimension LxWxH (mm) | Quantity | Plant location | Year of construction |
---|---|---|---|---|---|
Tecnimont | Pengerang | 4.000 x 1.800 x
(H) 3.200 mm | 1 | Malaysia | 2020 |
GE Oil & Gas
| KOREA YEOSU
| Control Room:
13.500 x 3.900 x 3.900
Battery Room:
2.250 x 2.500 x 3.000
| 1 + 1
| KOREA | 2020 |
GE Oil & Gas
| KOREA MV YEOSU
| 3.950 x 3.600 x 3.900
| 1 | KOREA | 2020 |
GE Oil & Gas
| LNG CANADA
| Control Room: 19500x4000x5600 Battery Room: 58000x68000x3500
| 4 + 4
| CANADA | 2020 in progress
|
GE Oil & Gas
| SEPLAT | E-House:
20000 x 20100 x 4000
EDG Room:
20.000 x 4.000 x 4.000 | 5 + 1
| NIGERIA | 2020 in progress
|
GE Oil & Gas
| LNG GOLDEN PASS
| LER Building: 29000x9100x4200 CER Building: 27800x4000x4000 | 12 | TEXAS (USA)
| 2020 in progress
|
GE Oil & Gas
| LNG PORTH ARTHUR
| 27.000 x 9.100 x 4.200
| 2 + 2 + 2 + 2
| TEXAS (USA)
| 2020 in progress
|
Baker Hughes
| MOZAMBICO LNG
| 25.500 x 6.000 x 4.000
| 6 | Mozambico | 2021 in progress
|
Siemens | MOZAMBICO LNG
| 21.000 x 6.000 x 3.900
| 6 | Mozambico | 2021 in progress
|
1
2
3
4
5
6
1
End user | Project description |
---|---|
Tirana Airport Nene Teresa | Power center medium and low voltage electric panels and secondary
distribution. |
Bari Airport Karol Wojtyla | Power center medium and low voltage electric panels and secondary
distribution. |
Aeronautica Militare | Medium and low voltage electric panels for the new CO.FA. Plants in Poggio
Renatico (FE). |
AGIP Petroli | Control and distribution electric panels with total isolation batteries for the
Gela plant. |
Nigerian AGIP Oil Company | Control room used as an electric panel room with main low voltage electric
panels, pull‐out drawers motor control centers, automation panels for the
revamping of the
Obama Flowstation in Nigeria. |
A.Q.P. | Variable frequency low voltage and technologic electric panels for the
Casamassima (BA) waterworks plants. |
ENEL | QP main panels for the La Spezia thermoelectric plant. |
Steel Works CO. LTD China | Jiangyn Xing Cheng Pull‐out drawer motor control center |
FIAT Avio | Main cab 5 power center panel for the Brindisi plant. |
FIAT Hitachi | Revamping of electric cabins and replacement of transformers and panels
for the Lecce plant. |
2
End user | Project description |
---|---|
Pilkington SIV | Power and automation electric panels and complete revamping of one
overhead crane in the San Salvo plant (CH). |
Pirelli cavi e sistemi | Control electric panels for the battipaglia (SA) plant. |
STM Catania | Control panels for the parallel handling of genereting sets. |
Courthouse in Florence | Medium voltage electric panels, main and secondary low voltage electric
panels, electric control and supervision of the new Courthouse. |
Faculty of foreign languages and literatures (BA)
| Medium voltage electric panels, main and secondary low voltage electric
panels. |
Faculty of law (BA)
| Medium voltage electric panels, main and secondary low voltage electric
panels. |
Regione
Puglia head quarter
| Power center medium and low voltage electric panels and secondary
distribution. |
Andria hospital (BAT) | Power center low voltage electric panels, secondary distribution and
technologic. |
Barletta hospital (BAT) | Power center medium and low voltage electric panels and secondary
distribution. |
Campobasso hospital | Power center medium and low voltage electric panels and secondary
distribution. |
3
End user | Project description |
---|---|
Castellana hospital (TA)
| Power center medium and low voltage electric panels and secondary
distribution. |
Conversano hospital (BA) | Power center low voltage electric panels and secondary distribution. |
Cotugno hospital (BA) | Power center medium and low voltage electric panels and secondary
distribution. |
Lucera hospital (FG) | Power center low voltage electric panels and secondary distribution. |
Parma hospital | Power center medium and low voltage electric panels and secondary
distribution. |
Saint Lucia hospital (the Caribbean)
| Power center medium and low voltage electric panels and secondary
distribution. |
Tirana hospital Nene Teresa | Power center medium and low voltage electric panels and secondary
distribution. |
Tirana city park commercial center
| Power center medium and low voltage electric panels and secondary
distribution. |
AUCHAN (Casamassima, Mesagne, Modugno, Pescara)
| Medium voltage electric panels, main and secondary low voltage electric
panels, electric control and supervision |
IPERCOOP (Bari, Lecce, Taranto) | Medium voltage electric panels, main and secondary low voltage electric
panels, electric control and supervision of the district |
4
End user | Project description |
---|---|
Carton Pack | Quadri nuovo opificio |
Politecnico di Bari
| I.N.F.N. RE.CA.S di Bari Quadri MT/BT Farm. Di calcolo. |
Alena
| Stabilimento di Potenza –Roma Stabilimento Aermacchi‐Caselle sud (TO) |
South oil company LTD | Supplying pumping system for Nassirya degassing (Iraq) |
ILVA Taranto | • Electric panels for overhead travelling crane partitioning _ Various plants • Main power center panel for various installations placed inside the Taranto iron and steel works. • Distribution power center electric panels for the RIV 1 plant. • Frixed drawer MCC panels for the XI ‐XII FORNI COKE 2000 BATTERY installation. • Pull‐out drawer MCC panels for briquetting installation. • Electric revamping of a limekiln and general automation panel supply. • MCC pull‐out drawer panels for the particulates evacuation fron AGL/2 plant. • Main power center panel for the STOK HOUSE 4 plant and the best furnace no. 4. • Power panels and electric over haul of metal clad, power center, motor control center with pull‐out and fixed drawers of the blast furnace no.5 • Power and automation panels and complete revamping of two slag overhead cranes and one stock‐house overhead crane of blast furnace no.5. • Main secondary low voltage distribution electric panels of the blast furnace no.5. • Quadri alimentazione e sezionamento carroponte zona IAF zona Plaz./ Acc. |
5
End user | Project description |
---|---|
Acmei Sud SpA for Foggia Hospital (Year 2017) | Electrical Main Panel QGBT‐2 SEZIONE NORMALE E PREFERENZIALE Dimensions: 9100x2200x1400 mm Electrical Main Panel QGBT‐2 SEZIONE SICUREZZA Dimensions: 2400x2200x1000 mm Electrical Main Panel QGBT‐2 SEZIONE CONTINUITA‘ Dimensions: 800x2200x1000 mm And other 90 distribution panels (various size) |
Acmei Sud SpA for Trani prison (Year 2017) | Main Distribution Panels: QGBT System pro E_Power Dimensions: 3500x2200x850 mm N°4 QPX TIPICO Dimensions: 1800x1950x240 mm And other 6 distribution panels (various size) |
Guastamacchia SpA for Regione Puglia (Year 2017) | Electrical Main Panel QGBT Dimensions: 9000x2200x1200 mm Electrical Main Panel.QCTEC Dimensions: 2000x2200x1200 mm Electrical Main Panel QGO Dimensions: 2800x2200x1200 mm Electrical Main Panel QGE Dimensions: 2800x2200x1200 mm Electrical Main Panel QUPS Dimensions: 2800x2200x1200 mm And other 38 distribution panels (various size) |
Sonepar Italia SpA for ILVA Taranto
(Year 2017)
| Electrical Panel Cooling Water SBO TNA/2 Dimensions: 3600x2200x800 mm Electrical Panel Cooling Water ASPI TNA/2 Dimensions: 2600x2200x800 mm Electrical Panel UTA ASPI TNA/2 Dimensions: 1600x2200x800 mm |
6
End user | Project description |
---|---|
Primiceri SpA for ILVA Taranto (Year 2017) | Electrical Panel POWER CENTER 400V PCA Dimensions: 7200x2200x1400 mm Electrical Panel POWER CENTER 400V PCFA Dimensions: 8200x2200x1400 mm Electrical Panel POWER CENTER 400V PCFA2 Dimensions: 7500x2200x1400 mm Electrical Panel POWER CENTER 400V PCF+PCC Dimensions: 13000x2200x1400 mm Electrical Panel MCC TCO3 Dimensions: 2500x2280x600 mm Electrical Panel MCC DEPRETTO 1 Dimensions: 2500x2280x600 mm Electrical Panel MCC DEPRETTO 2 Dimensions: 2500x2280x600 mm Electrical Panel MCC DEMA ½ Dimensions: 2500x2280x600 mm |
Primiceri SpA for Moe‐Tarragona‐Dangote‐Lemongrass‐Honeywell/Axion
(Year 2016/2017) | N°8 MCC Panel Moe Iraq Dimensions: 8000x2260x600 mm N°4 MCC Panel Moe Iraq Dimensions: 6400x2260x600 mm N°12 Distribution Panels Moe Iraq N°1 Distribution Panel Tarragona Spain N°8 Distribution Panels Dangote Nigeria N°1 Distribution Panel Petronas‐Lemongrass Malaysia N°2 380 VAC DISTRIBUTION PANEL Honeywell/Axion Argentine N°2 120 VAC DISTRIBUTION PANEL Honeywell/Axion Argentine N°2 24 VDC DISTRIBUZION PANEL‐RIE#10 Honeywell/Axion Argentine N°2 AUX DISTRIBUZION HVAC PANEL‐RIE#10 Honeywell/Axion Argentine N°2 MARSHALLING PANEL‐RIE#10 Honeywell/Axion Argentine N°2 PSP PANEL‐RIE#10 Honeywell/Axion Argentine |
Comes S.p.A. for Ilva Taranto FNA2 Plant (Year 2017)
| N°5 Electrical Disconnection Panel “AS2T” Dimensions: 1800x2200x1000 mm N°4 Electrical Disconnection Panel “AS2T Pd” Dimensions: 1800x2200x1000 mm N°2 Electrical Disconnection Panel “AS2T Ps” Dimensions: 1800x2200x1000 mm |
Bonatti/Sonatrach (Year 2017) | N°6 MDP Panel Dimensions: 3300x1800x 1000 mm N°6 PC‐MCC Panel Dimensions: 3600x2260x600 mm N°6 ERC‐DP Panel Dimensions: 900x2200x400 mm N°6 UPS‐DP Panel Dimensions: 590x840x360 mm N°6 PMC‐DP Panel Dimensions: 590x840x360 mm N°6 CRC‐DP Panel Dimensions: 900x2200x400 mm |