Electric panels

01.

L.V. Power Center Switchboards

02.

L.V. Motor Control Center Switchboards

03.

Unit Control Systems

04.

Generator Control Protection Panels

05.

Disconnector Switch Panels

06.

Automation Panels

07.

Distribution Panels

08.

Wind and Photovoltaic Control Panels

Production process phases

The quality is guaranteed by continuous controls which take place during the whole design, production and after-sale stages. We collect feedbacks from construction sites all around the world as examples for future applications; improvement is our daily commitment.

Based on our thirty years experience we guarantee the highest level of compliance in order to respect the standard of work.

01.

Designing

02.

Graphic rendering e 3D models

03.

Sheet metal cutting

04.

Punching metal

05.

Sheet metal bending

06.

Welding

07.

Painting

08.

Mounting and wiring

09.

Finished product

Typical project timeline
RFQ
TECNNICAL ALIGNEMENT
PO DATE
ENGINEERING PHASE
PROCUREMENT PHASE
CONSTRUCTION PHASE
PRE-FAT
RTS
SERVICES AFTER SALES
1
2
3
4
5
6
7
8
9

References

Most important electric panels references
End user
Project description
Tirana Airport Nene Teresa
Power center medium and low voltage electric panels and secondary distribution.
Bari Airport Karol Wojtyla
Power center medium and low voltage electric panels and secondary distribution.
Aeronautica Militare
Medium and low voltage electric panels for the new CO.FA. Plants in Poggio  Renatico (FE).
AGIP Petroli
Control and distribution electric panels with total isolation batteries for the  Gela plant.
Nigerian AGIP Oil Company
Control room used as an electric panel room with main low voltage electric panels, pull‐out drawers motor control centers, automation panels for the  revamping of the  Obama Flowstation in Nigeria.
A.Q.P.
Variable frequency low voltage and technologic electric panels for the  Casamassima (BA) waterworks plants.
ENEL
QP main panels for the La Spezia thermoelectric plant.
Steel Works CO. LTD China
Jiangyn Xing Cheng
Pull‐out drawer motor control center
FIAT Avio
Main cab 5 power center panel for the Brindisi plant.
FIAT Hitachi
Revamping of electric cabins and replacement of transformers and panels for the Lecce plant.
More information
Fill out the form with the requested data and send a request for information

    I've read and accept the processing of my personal data.