Control cabins
01.
Containerized substations
02.
Modular Buildings
03.
E-Houses Local
04.
Control Cabins
05.
Local Electrical Rooms
06.
Remote Instrument Enclosures
07.
Containerized Storage System
08.
Containerized Photovoltaic System
Design stage
General arrangement
P&I
Interconnection diagram
F&G system layout
MCT cable entry details
Grounding system layout
The quality is guaranteed by continuous controls which take place during the whole design, production and after-sale stages. We collect feedbacks from construction sites all around the world as examples for future applications; improvement is our daily commitment.
Based on our thirty years experience we guarantee the highest level of compliance in order to respect the standard of work.
01.
Designing
02.
Graphic rendering e 3D models
03.
Sheet metal cutting
04.
Punching metal
05.
Sheet metal bending
06.
Welding
07.
Painting
08.
Mounting and wiring
09.
Finished product
Typical project timeline
RFQ
TECNNICAL ALIGNEMENT
PO DATE
ENGINEERING PHASE
PROCUREMENT PHASE
CONSTRUCTION PHASE
PRE-FAT
RTS
SERVICES AFTER SALES
1
2
3
4
5
6
7
8
9